Place of Origin: | China |
Brand Name: | XIAYI |
Certification: | ISO9001:2008 |
Model Number: | Customized piston |
Minimum Order Quantity: | 500pcs |
---|---|
Price: | negotiation |
Packaging Details: | Packed in plastic box one by one, then in carton with standard export package |
Delivery Time: | 20 working days for tooling and new samples |
Payment Terms: | T/T, Western Union, L/C |
Supply Ability: | 50,000pcs per month |
Product Name: | Piston | Material: | Aluminum / Zinc Alloy |
---|---|---|---|
Press: | 150T | Application: | Shock Absorber |
Molds Time: | 25 Days | Plating: | No Steam |
Net Weight: | 36.7g | Size: | 35mm |
Highlight: | powder metallurgy components,PM parts |
FC-0208 or 0205 sinter piston with one time molding pressing without machining
Specifications:
Material |
P/M Copper and Copper Alloys |
P/M Iron and Carbon Steel |
|
Iron And Carbon Steel |
|
Iron-Copper And Copper Steel |
|
Sinter Hardened Steel |
|
Commix Low Alloy Steel |
|
Surface treatment |
Sand Blasting |
Zinc/Chrome Plating |
|
Rust-preventive treatment (steaming treating) |
|
Painting |
|
Electrophoresis |
|
Powder Coating |
Description:
Good quality sintered metal piston used together with PTFE straps
Our company produces different kinds of powder metallurgy products. These powder metallurgy products
including sintered rod guides, sinter pistons & sinter foot valves, the parts are delivered in a fully finished
condition and ready to be assembled along with other shock absorber components.
Sintered parts
Size: D35XD10X15
properties |
data |
Crushing strength (KN) |
≥7 |
Density (g/cm3) |
≥6.4 |
Hardness (HRB) |
60-80 |
Material actual component
Fe: 97.58%
C: 0.62%
Cu: 1.7%
Others: 0.1%
Material: MPIF FC-0205 or FC-0208 from GKN
No steam treatment
Die tooling design and making in house
Ultrasonic clearing and auto de-burring
Packaging
1. Soft foam to prevent the surface being scratched in one small cardboard box, several small boxes in
one larger hard cardboard with fills to avoid a slope, besides hard cardboard is easy to load and
transport
2. We can also arrange packaging according to your special requirements or discuss
Shipping
There are three ways to be chosen, as follows:
1. International Express: UPS, TNT, DHC
2. Port transportation: all ports
3. We delivery products according to customer’s requirements and paid by buyer after the destination
confirmation
4. Take insurance for the goods according to contract
Applications:
1. Automotive Part
2. Motorcycle Part
3. Pump Parts
4. Locomotive Parts
5. Machinery Parts
6. Tool Parts
Competitive Advantage:
1. Good service
2. Reasonable price
3. Strict quality control system
4. Punctual lead time
5. ROHS compliant
Picture show:
Contact Person: Leela
Tel: 008618958226902